This is a picture of the 1999 PES Sub Tour Group.
Here we are learning about how the bus is set up
and how switching is done.
Here is a group of capacitor banks totalling 3600 kVAR's per phase.
Here is a 50 MVA, 138/69 kV transformer.
Here is a switch leading from the capacitor banks.
This is an SF6 circuit breaker. The components of the
control box are being explained.
This picture shows the importance of grounding each
device in the substation to the grounding system of the
station.